D=LM/(R2+R1)
d(R2+R1)<span>=LM
[</span>d<span>(R2+R1)</span>]/M=L
Answer:
34 7
Step-by-step explanation:
Answer:
3854ft
Step-by-step explanation:
By assuming that the cable is not doubled.
in order to find the length of the base of the mountain
tan74°=3400/x
x= 3400/tan74°
x≈ 975ft
Therefore, the length of the cable equals to
=
length≈ 3854ft
Thus, the shortest length of cable needed is 3854ft
The answer for this problem is 6