Answer:
$17,277.07
Step-by-step explanation:
Present value of annuity is the present worth of cash flow that is to be received in the future, if future value is known, rate of interest is r and time is n then PV of annuity is
PV of annuity = ![\frac{P[1-(1+r)^{-n}]}{r}](https://tex.z-dn.net/?f=%5Cfrac%7BP%5B1-%281%2Br%29%5E%7B-n%7D%5D%7D%7Br%7D)
= ![\frac{3000[1-(1+0.10)^{-9}]}{0.10}](https://tex.z-dn.net/?f=%5Cfrac%7B3000%5B1-%281%2B0.10%29%5E%7B-9%7D%5D%7D%7B0.10%7D)
= ![\frac{3000[1-(1.10)^{-9}]}{0.10}](https://tex.z-dn.net/?f=%5Cfrac%7B3000%5B1-%281.10%29%5E%7B-9%7D%5D%7D%7B0.10%7D)
= ![\frac{3000[1-0.4240976184]}{0.10}](https://tex.z-dn.net/?f=%5Cfrac%7B3000%5B1-0.4240976184%5D%7D%7B0.10%7D)
= 
= 
= 17,277.071448 ≈ $17,277.07
A: From the graph, car B was traveling faster.
Because the line of car B is more steep than the line of car A.
B:
The lines cross at (2,80), this means that the two cars were traveling at the same distance (80 miles) at the same time (2 hours).
C:
Since the line passes through the points (0,0) and (2,80)
So the unit rate or slope is 40 mph.
The distance which car A traveled in the first four hours = 4x40= 160 mph
Answer:
you add 17+6 and it would be x=23
Step-by-step explanation:
At first find the area of rectangle:
(x + 4)*(x + 1) = x^2 + 5x + 4
Then find the area of triangle:

Then you must do like this
Area of rectangle - Area of triangle = Area of the shaded
x^2+5x+4 - (

)