1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
horsena [70]
3 years ago
15

PLEASE HELPPPPP please

Mathematics
1 answer:
Sidana [21]3 years ago
6 0

Formula to find the slope with two points: m=y2-y1/x2-x1, from the two points you were given (-2,-3) and (1,1). So m=1-(-3)/1-(-2)=4/3

You might be interested in
What is the the minimal education or degree i need to be a computer engineer?
andre [41]
Hello

The minimal degree is a bachelors degree

Hope this helps
Plz mark me as brainist
5 0
3 years ago
HELP! 20 POINTS!<br> Please answer the questions on the picture!
svetoff [14.1K]
Option one for the first question would be best because it is 2500 greater. Option 1 is 80000 while option 2 is only 77500.

5 0
4 years ago
Refering to the equation, tell how
Ugo [173]

Answer:

  the scale factor is the vertical expansion factor.

Step-by-step explanation:

The scale factor of 2 in

  g(x) = 2·F(x)

means g(x) is a <em>vertical expansion</em> (not shrink) of F(x) — by a factor of 2.

_____

<em>Additional comment</em>

The equation g(x) could be considered to be ...

  g(x) = F(x·√2)

in which case g(x) could be interpreted as a <em>horizontal shrink</em> by a factor of (√2)/2. Squeezing a parabola horizontally has the same effect on its appearance as stretching it vertically.

5 0
3 years ago
Find the mean absolute<br>deviation of the set of data.<br>3, 8, 10, 12, 15​
Westkost [7]
The mean is 9.6
3+8+10+12+15= 48/5= 9.6
8 0
3 years ago
Read 2 more answers
Create a word problem on Algebraic Expressions and Measurement (grade 10)​
mrs_skeptik [129]

Frank can build a fence in twice the time it would take Sandy. Working together, they can build it in 7 hours. How long will it take each of them to do it alone?

Answer

If Frank and Sandy can build the fence in 7 hours, they must be building

1

7

of the fence every hour.

Now, let the amount of time it takes Sandy be

x

hours so that Frank takes

2

x

hours. Sandy can build

1

x

of the fence every hour and Frank can build

1

2

x

of the fence every hour.

We now have the following equation to solve.

1

x

+

1

2

x

=

1

7

2

+

1

2

x

=

1

7

21

=

2

x

x

=

21

2

=

10.50

Thus, Sandy takes

10.50

hours and Frank takes

21

hours.

6 0
3 years ago
Other questions:
  • What is the slope of 3,4 and 0.5
    5·1 answer
  • If f(x) = 3x-2, then f (8) - f (-5) =​
    13·2 answers
  • Find the product of the following:<br>(i) 5 (-4)<br>(ii) (-8) (-6)​
    14·1 answer
  • The population of a country is 41291275.
    13·1 answer
  • HELP PLEASE WILL GIVE BRAINLIEST
    6·1 answer
  • 20 POINTSS Select all the values that are equivalent to the given expression. Express your answer in scientific notation.
    11·1 answer
  • can you find the lengths and area and type the correct code? Please remember to type in all caps with no space​
    5·2 answers
  • A company sells photo books, and they charge $20 for the book which includes the first ten pages. Each additional page costs $2.
    8·1 answer
  • Plz help asap I’ll give you 100 points
    15·2 answers
  • Perform the indicated operation. Show steps
    13·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!