30 * x = 245
lets divide 30 and 245, 245 / 30 = 8.167
8.167 x 30 = 245
hope it helped
C,g,a,j my teacher graded it with me today hope this helps! :)))
Answer:
x = 2.67
Move variables to the right and constants to the left, Then divide and you get the answer.
Step-by-step explanation:
-1.3+4.6x=0.3+4x (given)
-1.3x + 0.6x =0.3 (subtraction property of equality)
0.6x = 1.6 (addition property of equality)
x = 2.66666666667 (division property of equality)
2.66666666667 = 2.67 (rounding to the nearest tenth)
Answer:
1)- Variable utilities cost per machine hour = 1.6 per machine hour
2)- Fixed cost = 1740
3)-Total cost on 1220 Machine hour will be
= 3692
Step-by-step explanation:
1) CALCULATE VARIABLE UTILITIES COST PER MACHINE HOUR :
Variable utilities cost per machine hour = Change in cost/high machine hour-low machine hour
=4076-3388/1460-1030
Variable utilities cost per machine hour = 1.6 per machine hour
2) Fixed cost = Total cost-variable cost
= 3388-(1030*1.6)
Fixed cost = 1740
3) Total cost on 1220 Machine hour will be (1220*1.6+1740) = 3692
The scale factor is what you will use to make a whole shape bigger. For example if I have a square that all sides are 3 cm and the scale factor is 5 then the new square would have all sides 15 cm. So the length multiplied by the scale factor gives you the new length so then you take the new measurements and multiply them to get your new area. Hope this helps!!!!