You have two choices.
The minimum possible cost to operate your bat factory for a day is $390,
and there are two quantities of bats that both cost that much.
One possibility:
Produce no bats at all per day. Zero. Nada. None.
Cost = 0.06(0)² - 7.2(0) + 390 = $390 per day.
The other choice:
Produce 120 bats per day.
Cost = 0.06(120²) - 7.2(120) + 390
= 0.06(14,400) - 7.2(120) + 390
= 864 - 864 + 390
= $390 per day.
If you produce any other number of bats in a day ... more than zero
but not 120 ... then it will cost you more than $390 to operate the factory
that day.
The answer to this mathematical question would be "0.4x = 4.4". I simply subtracted 1.8x to both sides of the equation (following the subtraction property of equations) and then added 4.4 to both sides of the equation (following the addition property of equations). Thus, we arrive to the answer, 0.4x = 4.4.
Answer:
top right
Step-by-step explanation:count how mnay it goes back each time
Answer:
its option 3;92667
Step-by-step explanation:
6 and 8 is 68 so 9 2667 its 92667