I'm fairly sure that the answer is an ecosystom.
First, the values of 2sqrt(3) or 3sqrt(3) are not even twice the length of the given base, 3.
Next, I would say that 6 is the better answer than 12, assuming that the triangle is”drawn-to-scale”.
Finally, I think the hypotenuse is 6.
Find Total weight at left side

Now
Per block weight at right side

Considering that the p-value associated for a r<em>ight-tailed test with z = 2.115</em> is of 0.0172, it is found that it is significant at the 5% level, but not at the 1% level.
<h3>When a measure is significant?</h3>
- If p-value > significance level, the measure is not significant.
- If p-value < significance level, the measure is significant.
Using a z-distribution calculator, it is found that the p-value associated for a r<em>ight-tailed test with z = 2.115</em> is of 0.0172, hence, this is significant at the 5% level, but not at the 1% level.
More can be learned about p-values at brainly.com/question/16313918
Answer:
3 whole multiply by M subtracted from 7
Step-by-step explanation: