Answer: project manager
Explanation: The project manager's role. A project manager is a person who is responsible for initiating, preparing, designing, implementing, tracking, overseeing and closing a project successfully. A project manager is a person in charge for both smaller and larger decision-making.
Hence, as he or she is responsible for successful completion it is the responsibility of the project manager to define, approve and acquire all the documentation needed regarding the project.
The inventory control manager at Wheeled Coach would need to have ABC investigation as well as actualize tight physical control of the stockroom. He would likewise execute a cycle tallying framework, and guarantee that issues require building change sees for those things not at first included on the bill of material. To the degree attainable, stockrooms would be united.
Answer:
Congruent triangles has the two angles of one of their sides equal
This means if a triangle side has angles of 30 and 60 degrees the other triangle also has 30 and 60 degrees.
An isoceles triangle will have 2 angles of the same degree. Thus, If triangle A is isoceles then, two angles add up to make the third equal to one these two.
We should remember that angles inside a triangle always add up to 180ª
2a +b = 180
a + b = 180 - a
if the other triangle has 2 angles mathing the isoceles triangle, then it is also an isoceles.
Uploaded an image of an isoceles triangle to understand better.
Explanation:
Answer: True
Explanation:
International trade is simply exchange of goods and services that take place between countries. It should be noted that gloabl trading gives the countries and the consumer opportunity through which they're exposed to the produfte that they don't have in their countries.
International trade-dependent jobs have grown at a rate three times the growth of U.S.-dependent jobs.
This is True
Answer:
D) $31.
Explanation:
The computation of the predetermined overhead rate is shown below:
Predetermined overhead rate = Estimated manufacturing overhead ÷ estimated direct labor hours
where,
Estimated manufacturing overhead is
= Salary of factory supervisor + Heating and lighting costs for factory + Depreciation on factory equipment
= $37,600 + $22,000 + $5,600
= $65,200
And, the direct labor hours is 2,100
So, the predetermined overhead rate is
= $65,200 ÷ 2,100
= $31