1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Romashka [77]
3 years ago
12

A pole is centre of a circular pond of diameter 14m. Total height of a pole is 20m and its part inside a water is 3.5m. If a man

9f height 1.5m observed the top of the pole from the edge of pond, what is the angle of elevation does he get?​
Mathematics
1 answer:
monitta3 years ago
4 0

Answer:

hahahahahahahahahahahhahahahahahhahahahahahahahahhahahahahahahahahahahhahahahahahahahahhahahahahahahahahhahahwhwhwhwhwhwhahahahahhahahahhahahahahahahahahhahahahahahahahahahahahahahahhahahahahahahahahahahahahahhahahahahahahahahahahhahahahahahhahahahahahahahahahhahahahahahahahhahahahahahahahhahahahahahahahhahahahahhahahahahahah

You might be interested in
The table lists the average monthly cost to workers for family health insurance for various years.
almond37 [142]

Answer:

5 dollars :)

Step-by-step explanation:

ig

8 0
2 years ago
Simplify 3 x (7 - 2) + 6
erastovalidia [21]

Answer: 1

Step-by-step explanation:

8/-4 ÷ -3/9

8/-4 × 9/ -3 = 6

5 0
2 years ago
The number line represents – 4 + 3)
zepelin [54]

Answer:

- 4 1/2 + 3 1/4

-9/2 + 13/4

the lcm is 4

-18/4 + 13/4

=-5/4

= -1  1/4

Step-by-step explanation:

7 0
3 years ago
it takes electricians 36 days to wire a new housing subdivision. how many days would 32 electricians take to do the same job?
kolezko [41]

Answer:

The 32 electricians will take 1 day and 3 hours to complete the wiring.

Step-by-step explanation:

Since it takes electricians 36 days to wire a new housing subdivision, to determine how many days would 32 electricians take to do the same job the following calculation must be performed:

36/32 = X

1.125 = X

1 = 24

0.125 = X

0.125 x 24 = X

3 = X

Therefore, the 32 electricians will take 1 day and 3 hours to complete the wiring.

6 0
3 years ago
20 POINTS!!!!! (Voting Brainiest) Four Short Math Problems!!
ankoles [38]
1. To find the degree of the polynomial find the variable with the highest exponent, in this case is y^4 which means the degree of the exponent is 4.
2. 1, 2 and 3 are polynomials because there are more than one terms in the expression.
3. It would be a quadratic trinomial.
4. It would be a cubic binomial.

3 0
3 years ago
Read 2 more answers
Other questions:
  • The resultant of two forces acting at a point at right angles to each other is 32 pounds. If the horizontal force is 19 pounds,
    8·2 answers
  • What does the 'x' stand for in the Slope Intercept Form?
    12·2 answers
  • The width of a rectangle is 5 n minus 1.5 feet and the length is 1.5 n plus 9 feet. Find the perimeter of the rectangle.
    6·1 answer
  • Choose the property of addition that justifies the equation.
    9·1 answer
  • timothy is planting a garden. Tulips cost $125 per bub. The total cost c of his gardening supplies is $1.25 per bub b plus $10 f
    9·1 answer
  • Nita needs at least $85 to buy a skateboard. She already has $61. Which graph best represents all the possible dollar amounts th
    8·2 answers
  • You spin a spinner with 8 equally likely spaces numbered 1 to 8. Event A is the
    12·1 answer
  • The first photo in the collage is what I should make a copy of, anyone has any knowledge on how to add the numbers apart of the
    5·2 answers
  • PLEASE HELP!!!!!!!!! ​
    13·1 answer
  • I don’t wanna fail if you know the answer pls help :(
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!