Sketch the points (0,5,2),(4,0,-1),(2,4,6) and(1,-1,2) o a single set of coordinate axes?
nordsb [41]
Explanation:
As points have three coordinates i.e. x, y and z hence the sketch of the given four points is drawn in 3D shape and for that picture is attached here with this answer.
Points are given in the format as below
(value of x-coordinate , value of y-coordinate , value of z-coordinate)
In the attachment:
Point A = (0,5,2) (in blue color)
Point B = (4,0,-1) (in purple color)
Point C = (2,4,6) (in orange color)
Point D = (1,-1,2) (in black color)
Answer:
-4 I believe is the answer
Step-by-step explanation:
Hope this helps:)
Answer:
Step-by-step explanation:
a. The sample space for this spinner would be A, B or C . Since these are the only possible outcomes in this specific spinner.
b. The spinner has a total of 6 sections but each letter has 2 sections dedicated to it. Therefore, this makes only 3 possible outcomes in which the spinner will only land on 1. This means that the probability of each letter would be 1/3
Answer:
Engineer 1
Step-by-step explanation:
Based on the information given:
P( 1 ) = 0.7
P( 2 ) = 0.3
P(A | B) is a conditional probability: the likelihood of event A occurring given that B is true.
P( E | 1 ) = 0.02
P( E | 2 ) = 0.04
Then P( E | 1 ) is the probability that an error occurs when engineer 1 does the work and P( E | 2 ) is the probability that an error occurs when engineer 2 does the work.
To have an idea of which engineer is more likely to do the work when an error occurs you need to calculate P( 1 | E ) and P( 2 | E ), The probability that engineer 1 does the work when an error occurs and the probability that engineer 2 does the work when an error occurs.
The Bayes's theorem states:

Using the notation above:

P( E ) = 0.7*0.02 + 0.3*0.04 = 0.026 /// the probability that engineer 1 does the work and an error occurs or the probability that engineer 2 does the work and an error ocurrs.

Doing the same for engineer 2:

I'm sure the answer is 32 :)