Answer:
The graph crosses the x-axis at x = 0 and touches the x-axis at x = 3.
Step-by-step explanation:
When you graph this equation, you should see the zeros it passes and touches.
If George completed 3/5 of work in 9 days, it means that he needs 3 days to finish 1/5th of the work.
The remaining part is 2/5 because 1-3/5=2/5. 2/5 is also 6/15
From this, how much did George do? in the first 3 days he did 1/5th and then one more day was left, during which he did 1/5/3=1/15th.
So he did in total 1/15+1/5=1/15+3/15=4/15.
this means that Paul did the rest of 6/15, so Paul did 6/15-4/15=2/15.
So we know that he does 2/15 in 4 days, which means that every two days he can do 1/15 of the work
so he would need 15 times 2 days to finish the work - 30 days!
Terrence is not correct.
Terrence is not correct because pi is an irrational number, and it goes on forever with no actual sequence.
a. Given that y = f(x) and f(0) = -2, by the fundamental theorem of calculus we have

Evaluate the integral to solve for y :



Use the other known value, f(2) = 18, to solve for k :

Then the curve C has equation

b. Any tangent to the curve C at a point (a, f(a)) has slope equal to the derivative of y at that point:

The slope of the given tangent line
is 1. Solve for a :

so we know there exists a tangent to C with slope 1. When x = -1/3, we have y = f(-1/3) = -67/27; when x = -1, we have y = f(-1) = -3. This means the tangent line must meet C at either (-1/3, -67/27) or (-1, -3).
Decide which of these points is correct:

So, the point of contact between the tangent line and C is (-1, -3).
Answer:
4.609 meters
Step-by-step explanation:
The hypotenuse is the ladder because it is the slanted side. 3m is one of the other side lengths
A^2 + B^2 = C^2
3^2 + B^2 = 5.5^2
9 + B^2 = 30.25
30.25 - 9= B^2
21.25= B^2
4.609=B