Answer: |-10| < |11|
So choice C. is right.
hope this helps!
Answer:
Calculating (5 x 2) violates the order of operations
Step-by-step explanation:
According to the order of operations, multiplies all have equal priority. Therefore, they must be evaluated left to right, not right to left. Evaluating (5 x 2) first is incorrect, and instead (9 x 5) should be calculated first.
We are given with the number of jumps per student. To get the mean, we simply have to add all of them and divide by the number of students
mean number of jumps = <span>203 + 245 + 237 + 233 + 90 + 100 + 100 + 277 + 265 + 264 + 265 + 285 + 288 + 291 + 291 + 290 + 300 + 224 + 200 + 257 + 290 + 279 + 266 + 288) / 24
To get th median, arrange the data from lowest to highest and determine the middle value.</span>
Answer:
The formula to calculate standard deviation from probability is \sqrt(n*p*(1-p)). n is the sample size, and 200 in this case (number of putts for practice). p is 80% or 0.8, the probability that he can make it. So the standard deviation is \sqrt(200*0.8*(1-0.8)=\sqrt(200*0.8*0.2)=\sqrt(16)=4.
Answer:
It has no perfect square factors, unless you count 1 = 1^2. That's sort of a degenerate case we don't usually count, since every integer has that factor. We would usually say that 1290 is a square-free integer. Hope this helps!!