1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
AlekseyPX
3 years ago
10

|MATH|

Mathematics
2 answers:
blondinia [14]3 years ago
7 0
The answer is (1,1) Hope this helps :)
kirza4 [7]3 years ago
5 0
X = 1
y = 1
just plug 5y-4 in for x for the second equation
You might be interested in
Which expression is equivalent to 3x – 5?
3241004551 [841]

Answer:

2x -4 -1 +x

Step-by-step explanation:

8 0
3 years ago
Read 2 more answers
A Pyramid is placed inside a prism as shown in the pyramid has the same base area B as a prison but half the height H of the pri
guajiro [1.7K]

Answer:

D) V= 1/6 bh

Step-by-step explanation:

The expression that provides the volume of the pyramid is as follows;

As mentioned in the question

It is given that the pyramid put inside a prism

Also the pyramid contains the similar base area but the height is half of the prism

so the base area of the pyramid is b

And, the Height of the pyramid = h ÷ 2

Now as we know that  

The volume of the pyramid is

V = 1 ÷3 × base ares × height

= 1 ÷ 3 × b × h ÷ 2

V = 1 ÷ 6 bh

So, the volume is 1 ÷6 bh cube unit.

8 0
3 years ago
Read 2 more answers
PLEASE ANSWER ASAP FOR BRAINLEST!!!!!!!!!!!!!!!!1
posledela

<u>Assuming that k is variable:</u>

6k - 6²

<u>Assuming that 3k represents 3000:</u>

426×7

7 0
3 years ago
Read 2 more answers
The assignment problem constraint x31 + x32 + x33 + x34 ≤ 2 means
Step2247 [10]

The assignment problem is some of the significant combinatorial optimization difficulties in the division of operations research in mathematics. It contains of looking for a supreme weight matching in a weighted bipartite graph. The assignment problem constraint means that agent 3 can be assigned to no more than two tasks.

8 0
3 years ago
Find the unit rate for number of parts manufactured per hour if 1116 parts are made in 7 hours. Round to the nearest integer.
o-na [289]
The unit rate is obtained by dividing the amount of work done by the unit time. In the problem, we are already given the total number of parts manufactured (amount of work done) and the total amount of time to manufacture (7 hours). 

Obtaining the unit rate is as simple as dividing 1116 parts by 7 hours, as shown below:

Unit rate = 1116 parts / 7 hours
Unit rate = 159.42857

Therefore the unit rate is approximately 159 parts/h.
5 0
3 years ago
Other questions:
  • a recycling bin is in the shape of a rectangular box find the height of the box if it's length is 18 ft its width is 8 feet and
    11·2 answers
  • What is the slope of a line parallel to the line 3x-9y =18<br><br> A)-3/9<br> B)3<br> C)1/3<br> D)-2
    11·1 answer
  • Which measurement of a polygon in the shape of a square with 6-inch sides is a perfect square?
    14·1 answer
  • Help math !!!!!!!!!!!!!!!!!!!!!!
    6·2 answers
  • 2 Mr. Jackson earns $10 per hour working in an electronics store. In addition, he earns 5% commission on all of his computer sal
    7·1 answer
  • The chance that a positive response is obtained from Chicago fro program 1 is %. The chance that a positive response is obtained
    12·1 answer
  • Jake earns between $295 and $305 a day. About how much money does he earn in 15 days? (Show work/steps)
    15·1 answer
  • Find two numbers if their sum is 91 and the ratio is 6:7.
    11·2 answers
  • The variable x varies directly as y and x varies inversely as z. What is the value is y when x=20 and z=-2, if y=30 when z=3 and
    12·1 answer
  • Select all the equivalent ratios of 8:12... 7:21 20:30 5:15 2:3 16:24 and 1:3
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!