Using the z-table, the probability that a student taking this test will finish in 100 minutes or less is 0.0824 or 8.24%.
For a normally distributed set of data, given the mean and standard deviation, the probability can be determined by solving the z-score and using the z-table.
First, solve for the z-score using the formula below.
z-score = (x – μ) / σ
where x = individual data value = 100
μ = mean = 125
σ = standard deviation = 18
z-score = (100 – 125) / 18
z-score = (-25) / 18
z-score = -1.39
Find the probability that corresponds to the z-score in the z-table. (see attached images)
-1.39 - (-1.3) : -1.4 - (-1.3) = x - 0.0968 : 0.0808 - 0.0968
-0.09 : -0.1 = x - 0.0968 : -0.016
x - 0.0968 = -0.09(-0.016)/-0.1
x = -0.0144 + 0.0968
x = 0.0824
x = 0.0824
Hence, the probability that a student taking this test will finish in 100 minutes or less is 0.0824 or 8.24%.
Learn more about probability here: brainly.com/question/26822684
#SPJ4
<u>Answer-</u>
<u>Solution-</u>
The given function is,
Now, we have to find the value of f(x) at x=2 i.e f(2), so putting x as 2 in the given function,
Therefore, f(2) was found to be 46.
Answer:
w = -20
Step-by-step explanation:
- + 9 = 13
Shift the (+9) to the other side of the equation. (+9) will turn into (-9).
- = 13 - 9
= 4
Shift the (÷5) to the other side of the equation. (÷5) will turn into (×5).
-w = 4 × 5
= 20
Multiply both sides of the equation by (-1) so that -w will turn into w.
w = (-1) × 20
w = -20