They both equal 1/x.
Start by breaking the radicand up into a product of known factors.
A) Ang 1 + Ang 2 = 90
B) Ang 1 = Ang 2 + 20
B) Ang 1 -Ang 2 = 20 then adding this to equation A produces
2 Ang1= 110
Ang 1 = 55 degrees
Ang 2 =35 degrees
If George completed 3/5 of work in 9 days, it means that he needs 3 days to finish 1/5th of the work.
The remaining part is 2/5 because 1-3/5=2/5. 2/5 is also 6/15
From this, how much did George do? in the first 3 days he did 1/5th and then one more day was left, during which he did 1/5/3=1/15th.
So he did in total 1/15+1/5=1/15+3/15=4/15.
this means that Paul did the rest of 6/15, so Paul did 6/15-4/15=2/15.
So we know that he does 2/15 in 4 days, which means that every two days he can do 1/15 of the work
so he would need 15 times 2 days to finish the work - 30 days!
The number of patches that Leia can cut from 32 pieces of the fabric measuring 18 cm by 10 cm will be as follows:
Number of pieces=[total area of fabric]/[area of patch]
area of fabric=18×10=180 cm²
Area of 32 patches=180×32=5760 cm²
Area of patch=45 cm²
Number of patches=5760/45=128 patches