1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
JulsSmile [24]
3 years ago
13

Help please. and if you can, explain.

Mathematics
2 answers:
Vladimir [108]3 years ago
8 0

Answer:

2400

Step-by-step explanation:

harkovskaia [24]3 years ago
5 0

Answer:

I am saying 10ft

Step-by-step explanation:

Hope this helps.

btw can't explain sorry.

You might be interested in
Mar 10, 11:28:13 PM
Virty [35]

Answer:

e

s249

Step-by-step explanation:

i dont have an explanation but yeah sorry

5 0
3 years ago
Read 2 more answers
Need help with geometric sequences <br> 30 points
NeTakaya

Answer:

a_{n} = 6(5)^{n-1}

Step-by-step explanation:

The n th term of a geometric sequence is

a_{n} = a(r)^{n-1}

where a is the first term and r the common ratio

Here a = 6 and r = 30 ÷ 6 = 5, thus

a_{n} = 6(5)^{n-1}

8 0
3 years ago
Brianna played a trivia game in which she lost 5 points for each incorrect answer and gained 10 points for each correct answer.
Levart [38]

Answer:

90 points

Step-by-step explanation:

10 times 11 is 110

4 times 5 is 20

110 minus 20 is 90

5 0
4 years ago
Can somebody help me put the numbers in the 2 empty boxes.
Alja [10]

Answer:

I think its 4 and 5

Step-by-step explanation:

8 0
3 years ago
A bucket that has a mass of 30 kg when filled with sand needs to be lifted to the top of a 30 meter tall building. You have a ro
Rom4ik [11]

Answer:

765 J

Step-by-step explanation:

We are given;

Mass of bucket = 30 kg

Mass of rope = 0.3 kg/m

height of building= 30 meter

Now,

work done lifting the bucket (sand and rope) to the building = work done in lifting the rope + work done in lifting the sand

Or W = W1 + W2

Work done in lifting the rope is given as,

W1 = Force x displacement

W1 = (30,0)∫(0.2x .dx)

Integrating, we have;

W1 = [0.2x²/2] at boundary of 30 and 0

W1 = 0.1(30²)

W1 = 90 J

work done in lifting the sand is given as;

W2 = (30,0)∫(F .dx)

F = mx + c

Where, c = 30 - 15 = 15

m = (30 - 15)/(30 - 0)

m = 15/30 = 0.5

So,

F = 0.5x + 15

Thus,

W2 = (30,0)∫(0.5x + 15 .dx)

Integrating, we have;

W2 = (0.5x²/2) + 15x at boundary of 30 and 0

So,

W2 = (0.5 × 30²)/2) + 15(30)

W2 = 225 + 450

W2 = 675 J

Therefore,

work done lifting the bucket (sand and rope) to the top of the building,

W = 90 + 675

W = 765 J

5 0
3 years ago
Other questions:
  • Randall recorded 8 songs on his most recent CD the total length of the CD is 49 minutes find a until rate to represent the avera
    10·1 answer
  • A circle has a diameter of 10 feet. What is the area of the circle? Leave answers in terms of π.
    13·2 answers
  • Help Asap Please!! mark as Brainliest
    12·2 answers
  • Mr.Smith's art class has a total of 35 students enrolled. Seven of the thirty five are girls. What percent of the class is made
    14·2 answers
  • Original: $42.54
    15·1 answer
  • Joy organized a wedding. Guests had to choose their meal from beef, chicken or vegetarian.1/3 of the guests chose beef5/12 of th
    9·1 answer
  • Suppose you have a photography service, your personal camera cost you $756.50. You charge $50 per photo session and it cost your
    7·1 answer
  • {Q#2} Given the circle with equation x+ y =17
    12·1 answer
  • Please help me! This is for a grade so if you don’t know it please don’t answer this question! I will give brainliest if right!!
    11·1 answer
  • Answer For X (in degrees)
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!