Answer:
Step-by-step explanation:jdjdjsjsjsjssjjsns
Total cost for tiles and paints is $924.
Step-by-step explanation:
We have been given that a community hall is in the shape of a cuboid. The hall is 40m long 15m high and 3m wide.
The paint will be required for 4 walls and ceiling.
Let us find area of walls and ceiling.
Therefore, the area of walls and ceiling is 1410 square meters.
Given: Cost for 10 litre of paint is $10 and 10 litre paint covers 25 square meter. Therefore,
Therefore, the total painting cost is $564.
Tiles will be required for floor. Let us find the area of floor.
Given: 1m squared floor tiles costs $3. So,
Therefore, the total cost for tiles is $360.
Now let us find combined total cost of tiles and paint.
Therefore, the combined total cost of tiles and paint is $924.
Answer:
a) 8.2962
b) 6.3956
c) 3.845
Step-by-step explanation:
Z-score:
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this question, we have that:

(a) What response represents the 85th percentile?
This is X when Z has a pvalue of 0.85. So X when Z = 1.037.




(b) What response represents the 62nd percentile?
This is X when Z has a pvalue of 0.62. So X when Z = 0.306.




(c) What response represents the first quartile?
The first quartile is the 100/4 = 25th percentile. So this is X when Z has a pvalue of 0.25, so X when Z = -0.675.




Answer:
$71.59
Step-by-step explanation:




