Answer:
3x ^2
Step-by-step explanation:
x ^3-2
u = 9 i - 6 j
v = -3 i - 2j
w = 19 i + 15 j
u • v = (9 i - 6 j) • (-3 i - 2j)
Distribute the dot products:
u • v = 9*(-3) (i • i) + 9*(-2) (i • j) + (-6)*(-3) (j • i) + (-6)*(-2) (j • j)
i and j are orthogonal unit vectors, so their dot products are 0, while i • i = j • j = 1. So we have
u • v = 9*(-3) + (-6)*(-2) = -27 + 12 = -15
In other words, the dot product can be computed by simply multiplying corresponding components, and taking the total.
u • w = 9*19 + (-6)*15 = 81
Answer:
The inequality representing the time taken by the entire cycle is:
Step-by-step explanation:
The time taken to complete one cycle of a manufacturing machine is no longer than 3 minutes.
It is provided that the manufacturing machine has two processes.
One of them is repeated 4 times and the second only once.
Assume that the variable <em>x</em> represents the time taken to complete the first process once.
Then the time taken to complete the first process 4 times would be, 4<em>x</em>.
Also assume that the variable <em>y</em> represents the time taken to complete the second process.
Then the inequality representing the time taken by the entire cycle is:
Consider the graph below representing the above equation.
Answer: $11.666667 per hour (rounded = $12 per hour)
Step-by-step explanation:
Answer:
x=-19 x=30
Step-by-step explanation:
-5x-15=-3x+23
-23 -23
-5x-38=-3x
+5x +5x
-38=2x
/2 /2
-19=x
-107-7x=73-13x
-73 -73
-180-7x=-13x
+7x +7x
-180=-6x
30=x