1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
vovangra [49]
3 years ago
8

Why do scientist observe blueshift in certain stars.

SAT
1 answer:
Ede4ka [16]3 years ago
3 0
to understand motions of galaxies toward each other and toward our region of space
You might be interested in
If you created a game with realistic vehicle physics what kind of genre would your game fall into
stiv31 [10]

A. "vehicle simulation"

I'm for sure that is the right answer!

8 0
3 years ago
Read 2 more answers
In the country of United States of Height, the height measurements of ten-year-old children are approximately normally distribut
Rashid [163]

Answer:

a) We need to find p(x<68.15)

Standardize x to z, we have, z = (68.15-μ)/σ

=(68.15-57)/8.1

=1.38

Reading from standard normal tables,

p(z<1.38) =0.9162.

b) We need to find p(x>54.4)

Standardize x to z, we have, z = (54.4-μ)/σ

=(54.4-57)/8.1

=-0.32

Reading from standard normal tables,

p(z>-0.32) = 0.6255

7 0
2 years ago
saddle inc. has two types of handbags: standard and custom. the controller has decided to use a plantwide overhead rate based on
aleksklad [387]

a. Computation for the overhead rate using the traditional plantwide approach

Plantwide overhead rate = 303,000/145,000

Plantwide overhead rate= 208.97%

(43,000 + 102,000 =145,000)

b. Computation for  the overhead rates using the activity-based casting approach

Machining = 196,000/2,580

Machining= 75.97 per machine hour

Machine setup = 107,000/490

Machine setup = 218.37 per setup

c. Calculation to determine  the difference in allocation between the two approaches.

Overhead allocated :

Traditional  costing

Standard= (43,000×208.97%)

Standard=89,857

Custom=(102,000×208.97%)

Custom=213,149

Activity based costing

Standard= (1,310×75.97)+(110×218.37)

Standard=99,520.7+24,020.7

Standard=123,541

Custom=(1,270×75.97)+(380×218.37)

Custom=96,482+82,981

Custom=179,463

Learn more here:

brainly.com/question/16565524?referrer=searchResults

5 0
2 years ago
REASONING The design for a park is drawn on a coordinate graph. The perimeter of the park is modeled by the equation (x−3)2+(x−7
andreev551 [17]

Answer:

the radius is 150

Explanation:

4 0
4 years ago
A cylindrical bin with a diameter of 15 feet, 3 inches and a height of 24 feet, 4 inches is used to hold wheat. One cubic foot h
Scrat [10]
I'm pretty sure it's B.
5 0
3 years ago
Other questions:
  • Amy was observing the growth of five kinds of flowering plants on a windowsill. She noticed that some of the flowers on
    5·1 answer
  • How do people fart every day
    15·2 answers
  • Can someone help me with this? ASAP?
    11·1 answer
  • Here are some known facts about creatures on the planet Zorbus:
    11·2 answers
  • The distance between 7.2 and -3.5
    13·1 answer
  • The product of two consecutive positive integers is greater than their sum by 209.
    12·1 answer
  • How much pure alcohol must a pharmacist add to 10 cm.
    10·1 answer
  • What is the solubility of mg(oh)₂ at a ph of 12.70? (ksp mg(oh)₂ is 1.6 × 10⁻¹³)
    6·1 answer
  • What do you think made the faculty member believe this was a Ponzi-type scheme
    7·1 answer
  • \If an electron is released from infinity, how fast will it be traveling after falling to within 1x10-10 m of a proton
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!