1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
asambeis [7]
3 years ago
8

Thank you pls don’t send any links

Mathematics
2 answers:
muminat3 years ago
7 0
10d+5 I know it is you will get it right
Yessssssss
Zielflug [23.3K]3 years ago
5 0

Answer:

<u>Option 4:</u> 10d + 5

Step-by-step explanation:

Given the algebraic expression, 5(2<em>d</em> + 1), which represents the fines per day, <em>d</em>, for overdue books.

In order to determine the equivalent algebraic expression of 5(2<em>d</em> + 1), we must distribute 5 into the terms inside the parenthesis:

5(2d<em> </em>+ 1)

= 5(2d) + 5(1)

\fbox{\textsf{= 10d + 5 }}

Therefore, the equivalent expression is: 10d + 5.

You might be interested in
the track at east side high school is 440 yards long it took maya 10 min to jog around the track 4 times. find her speed in mile
SashulF [63]
Her speed i think is 40 miles per hour

7 0
3 years ago
Read 2 more answers
Does 2 x 6 +15538 equal 15550
k0ka [10]
Yes, it does
12+15538=15550
3 0
3 years ago
Read 2 more answers
20 POINTS + BRAINLIEST AND THANKS
elena55 [62]

Answer:

1. 94.25 is the  surface area, 94.25 to 56.55 is the ratio of surface area to volume

2.138.23 is the  surface area 138.23 to 113.1 is the ratio of surface area to volume

7 0
4 years ago
How to solve the equation.. 1/4x=7
Sedaia [141]

Answer:

b

Step-by-step explanation:

b

6 0
3 years ago
Read 2 more answers
When estimating a job to bid, a contractor’s estimator first determines the actual cost of labor using the function
CaHeK987 [17]

Answer:

M(B(h))=78.18025h

Step-by-step explanation:

First we have the following equations:

L(h) = 28.75h         eq. 1

B(L) = 1.78L            eq. 2

M(B) = 1.43B           eq. 3

To find the selling price based on the estimated number of hours, we need to start replacing equation 1 in equation 2 as:

B(L) = 1.78*B  

B(L(h)) = 1.78*(28.75h)

B(L(h)) = B(h) = 51.175h       eq. 4

Finally, if we weplace equation 4 in equation 3, we get:

M(B) = 1.43B

M(B(h)) = 1.43*(51.175h)

M(B(h)) = 73.18025h

So, the composite function that can be used to find the selling price for the labor portion of a bid based on the estimated number of hours is:

M(B(h)) = 73.18025h

4 0
4 years ago
Other questions:
  • Draw a model that shows 0.16
    14·2 answers
  • CAN SOMEONE PLEASE HELP ME!!!!
    15·1 answer
  • Find the area of the triangle 9 yd, 3 yd and 8 yd
    15·2 answers
  • What are the next two terms in the pattern 3,6,5,10,9,18,17
    6·1 answer
  • Can you help me with the 2 questions please help!!!​
    7·1 answer
  • Help me pleaseeeee!!!
    9·2 answers
  • I have so many on here pleasehelp me it sin algebra1
    15·1 answer
  • Always confusing pls help
    10·1 answer
  • 1<br> 1/2 (C-8)<br> Help pls
    11·1 answer
  • Simplify (ab2 + 10 + a) – (6ab2 - 2ab + 8). I want it with steps please
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!