He must work 13 hours. I don't feel like showing my work.
Six is the base because 6^4 is 1296.
Explanation:
To achive that you have to piant a ring in red, which will have its big diameter equal to the sphere diameter and its small diameter equal to the cube diagonal.
The diagonal of the cube can be calculated using Pithagoras:

Where D is the diagonal and L is the side of the cube
Answer:
0.1151 = 11.51% probability of completing the project over 20 days.
Step-by-step explanation:
Normal Probability Distribution
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Expected completion time of the project = 22 days.
Variance of project completion time = 2.77
This means that 
What is the probability of completing the project over 20 days?
This is the p-value of Z when X = 20, so:



has a p-value of 0.1151.
0.1151 = 11.51% probability of completing the project over 20 days.
Answer:
y = 2 * 9 ^ x
Step-by-step explanation:
From the first point, you can get the value of a, since any number with power 0 with always equal to 1
Now you have y = (2)(b ^x), use the second point, substitute the value of X and y to (3,1458) to get the B value.
- 1458 = 2b ^ 3
- 729 = b ^ 3
- B = 9