Answer:
Following are the solution to this question:
Explanation:
Some of the data is missing in the question, which is defined in the attached file. Please find it.
Follows are the formula which is used in the question:
- EmployeeAnalysis Worksheet IF(C5>49,"Certified","Not Certified")
- Transactions Worksheet IF(F10="No","",0.07)
In the first condition, it checks "C5" is greater than 49 if the condition is true, it will give "Certified" otherwise, it will give "Not Certified".
In the second condition, it checks "F10" is equal to "No" if the condition is true, it will give a blank or space otherwise, it will give "0.07".
Answer:
never gonna give you uppp
Explanation:
criiiiii
Answer:
Identify the purpose, audience, and audience needs for preparing image,Identify three phases that might appear in a project plan. When planning your design project you might include on an outline the goals.
Answer:
The answer is below
Explanation:
The amount of power dissipated by a processor is given by the formula:
P = fCV²
Where f = clock rate, C = capacitance and V = Voltage
For the old version of processor with a clock rate of f, capacitance C and voltage of V, the power dissipated is:
P(old) = fCV²
For the new version of processor with a clock rate of 20% increase = (100% + 20%)f = 1.2f, capacitance is the same = C and voltage of 20% increase = 1.2V, the power dissipated is:
P(new) = 1.2f × C × (1.2V)² = 1.2f × C × 1.44V² =1.728fCV² = 1.728 × Power dissipated by old processor
Hence, the new processor is 1.728 times (72.8% more) the power of the old processor