Answer:
global warming will probably cause lots of species to either adapt or go extinct
Explanation:
Answer: A.
The US will import more from Japan.
Explanation: I did this on Edge
D! all of the others are commonly used
The weathering of the mountain peak will be mostly through the influence of the wind, water, and ice, while the bedrock under a forest will be influenced by the plants.
Explanation:
The weathering is a process that occurs everywhere in the world, on the surface and close to the surface of the planet. This process is basically the breaking up of particles from larger masses of rocks. Which type of weathering will be dominant at a particular place depends n multiple factors, such as:
- topography
- vegetation
- climate
- presence/absence of water
A bear mountain peak will be exposed to strong winds. Also, the lack of vegetation will enable the water from the rainfall to have big influence, while in the colder months the formation of ice will contribute to significant weathering. On the other side, the bedrock under a forest will have minimal influence from wind, water, and ice, as the vegetation provides protection. The vegetation on the other hand, with its roots, as well as with the decomposition will manage to weather the rocks, both on the surface and inside the ground.
Learn more about types of climate brainly.com/question/10235846
#learnwithBrainly
4 men x 8 days = 32 days work content & 6 women x 8 days = 48 work content
6 women at 1/400 per day x 8 days is 48/400. 352+ so 1 mans daily output is 11 work units per day x 4 men = 44 work output per day x 8 days = 352 total work output
3 men x 10 days = 30 days work content & 7 women x 10 days = 70 work content
1 man work output is 11 x 3 men x 10 days = 333 work units
one woman’s work output is 1/400 per day x 7 women = 7/400 per day x 10 days = Total of 70 work output plus men’s output of 330 = 400 work units.
10 women x 40 days = 400 work content
so if 10 men carried out the work its 11 x 10 men = 110 work units per day
400 work units + 110 work units per day = 3.6363 days work for 10 men.
1 women daily work output = 1/400 unit per person x 10 women or 10/400 work units per day so 10 x 40 days
4 Men & 6 Women = 8 days (men = 4 x 8 x 11 = 352)( 6 x 8 x 1/40 = 48/40
3 Men & 7 Women=10 days (men = 3 x 10 x 11 = 330)(7 x 10 x 1/40 =70/40)
10 women at 1/400 each per day x 40 days is 400 work units
while 10 men x 11 units is 110 units per day so for 400 units it’s 3.6363 days
1 man is equal approximately to 11 Women
10 men can do job in 3.6363 days x ratio of 11 =
Answer: It will taken 10 women x 40 days to complete the same job.