2) mixed economies
3) market
The data from the map showed that Green revolution and farm mechanization helped to improve rice production in Southeat Asia and less developed countries of the world.
<h3>What is scale of analysis?</h3>
Scale of analysis of a map refers to the different units of measurement used to describe different aspects of the world.
The scale of analysis used in the two maps is economic scale of analysis.
Based on the data from the map;
- Southeast Asia are shaded in a single color in the world map but differently in the regional map since it represents the overall regional production of rice.
- The rice production data for Southeast Asia and West Africa is 0.5 ton 1.0 ton per acre indicating intensive land use for rice production.
- The use of machines in farming helped to increase food production making the Green revolution possible.
- The Green revolution resulted in increase food production in less developed countries.
- Mechanization improved rice production in less developed countries.
- The use of agricultural chemicals such as fertilizer and pesticides helped to improve rice production worldwide.
Learn more about Green revolution at: brainly.com/question/25077523
<u>Answer:
</u>
An anemometer will be used to measure the speed of the wind.
<u>Explanation:
</u>
- An anemometer is a simple device used to measure the speed of the wind by most meteorologists. The structure of this device is simple as it has three or sometimes four cups attached using horizontal strips made up of steel to a vertical rod.
- As the wind blows over the cups, the cups are pushed by the wind making them move. Hence, the vertical rod moves as the wind blows. The revolutions of the vertical rod for a specific time are counted and averaged in order to determine the speed of the wind.
Pretty sure it’s Latina/Latino/Latinx
Answer:
True
Explanation:
A project Charter is a document signed by the sponsor in agreement that the project team is giving the go-ahead to carry out the project in accordance to the terms and conditions, this document shows those involved in the project, (Stake holders,project manager and team) After this document is given and signed in mutual agreement, then project kick off starts according to the schedule/plan.