Answer:
C
Step-by-step explanation:
I used the formula. it took a long but i got it! Brainly pls!
We know that
(ad)/(bd)=d/d time a/b=a/b since d's cancel
also
if a/b=c/d in simplest form, then a=c and b=d
we have
p/(x^2-5x+6)=(x+4)/(x-2)
therefor
p/(x^2-5x+6)=d/d times (x+4)/(x-2)
p/(x^2-5x+6)=d(x+4)/d(x-2)
therefor
p=d(x+4) and
x^2-5x+6=d(x-2)
we can solve last one
factor
(x-6)(x+1)=d(x-2)
divide both sides by (x-2)
[(x-6)(x+1)]/(x-2)=d
sub
p=d(x+4)
p=([(x-6)(x+1)]/(x-2))(x+4)
Answer:
The plumbers cost would be equal to the equation 80+45x=y with y being the total amount of money he made and x being how many hours he worked.
Step-by-step explanation:
In this equation to find the amount the plumber was paid all you need to do is plug in the amount of hours he worked for x.
If the plumber worked his maximum of 8 hours then the equation would change from 80+45x=y to 80+(45×8)=440.
So, if the plumber worked for 8 hours he would make $440.
Answer:
-3 <x <-1
Step-by-step explanation:
|x + 2| < 1
There are two solutions, one positive and one negative ( remember to flip the inequality for the negative)
x+2 <1 and x+2 > -1
Subtract 2 from each side
x+2-2 < 1-2 and x+2-2 > -1-2
x < -1 and x >-3
-3 <x <-1
Answer:
The statement written as a formula is. a12a9=125. We can simplify the fraction, and we have. a3=125. To solve for a , take the third root
Step-by-step explanation: