The application of a single cost rate across processes is not a task associated with activity-based costing.
<h3>What is activity-based costing?</h3>
The expression 'activity-based costing' makes reference to the methods aimed at calculating costs.
This strategy requires the estimation of overhead costs, which may include, for example, the salary of employees.
In conclusion, the application of a single cost rate across processes is not a task associated with activity-based costing.
Learn more about activity-based costing here:
brainly.com/question/6654166
#SPJ1
Answer:
A
Explanation:
College and career planning
Since the boulder is raised with constant velocity, the net force on the boulder is zero, so that the boulder has weight 175 N on this planet. If its mass is 87.5 kg, then the acceleration due to gravity is g such that
175 N = (87.5 kg) g ⇒ g = (175 N) / (87.5 kg) = 2.00 N/kg = 2.00 m/s²