1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Sever21 [200]
3 years ago
13

You are researching RAM for a computer you are building for a friend who will be using the system as a home office server for he

r small business. She wants the added protection so the computer will not crash due to a memory error.
What type of RAM should you consider purchasing?

a) Unbuffered
b) Buffered
c) ECC
d) Registered
Computers and Technology
1 answer:
pashok25 [27]3 years ago
8 0

Answer:

ECC RAM

Explanation:

ECC RAM is the most popular Random Access Memory out there that is used by most business servers. Dealing with big data for most huge businesses is crucial. The need to prevent loss of data requires that they purchase ECC RAM. ECC RAM automatically protects the systems from potential errors that occur in memory. Any abrupt changes in temporary data stored in ECC RAM are automatically corrected. This is achieved by an additional memory chip that acts as error detection for the other eight RAM chips.

You might be interested in
suppose task c has two predecessor tasks: task a and task b. task a ends on may 8 and task b ends on may 13. when can task c beg
san4es73 [151]

Suppose task c has two predecessor tasks: task a and task b. task a ends on may 8 and task b ends on may 13. The time that task c can  begin is may 14.

<h3>What does task mean in its other sense?</h3>

It is seen as Assignment, chore, duty, job, and stint are a few examples of common synonyms for task. Task implies work that is imposed by a person in authority, an employer, or circumstances, even though all of these words mean "a piece of work to be done."

Note that you may be asked to write a letter, a feature article, an editorial, or a speech. who you're pretending to write to in response to the prompt. Hence starting by on the 14th is advisable.

Learn more about task  from

brainly.com/question/12831236
#SPJ1

8 0
1 year ago
A collection of entries posted on a web site and displayed in reverse chronological order (from newest to oldest entries), is kn
Zina [86]
A) Social Collaboration

Social Collaboration is a way for people to combine their information and make it easier to go through and to work well as a team.
7 0
3 years ago
A raised dot (ú) shows where the ENTER key was pressed. <br> a. True<br> b. False
MatroZZZ [7]
Its false nothing comes up when u press that key
5 0
3 years ago
Consider a single-platter disk with the following parameters: rotation speed: 7200 rpm; number of tracks on one side ofplatter:
horsena [70]

Answer:

Given Data:

Rotation Speed = 7200 rpm

No. of tracks on one side of platter = 30000

No. of sectors per track = 600

Seek time for every 100 track traversed = 1 ms

To find:

Average Seek Time.

Average Rotational Latency.

Transfer time for a sector.

Total Average time to satisfy a request.

Explanation:

a) As given, the disk head starts at track 0. At this point the seek time is 0.

Seek time is time to traverse from 0 to 29999 tracks (it makes 30000)

Average Seek Time is the time taken by the head to move from one track to another/2

29999 / 2 = 14999.5 ms

As the seek time is one ms for every hundred tracks traversed.  So the seek time for 29,999 tracks traversed is

14999.5 / 100 = 149.995 ms

b) The rotations per minute are 7200

1 min = 60 sec

7200 / 60 = 120 rotations / sec

Rotational delay is the inverses of this. So

1 / 120 = 0.00833 sec

          = 0.00833 * 100

          = 0.833 ms

So there is  1 rotation is at every 0.833 ms

Average Rotational latency is one half the amount of time taken by disk to make one revolution or complete 1 rotation.

So average rotational latency is: 1 / 2r

8.333 / 2 = 4.165 ms

c) No. of sectors per track = 600

Time for one disk rotation = 0.833 ms

So transfer time for a sector is: one disk revolution time / number of sectors

8.333 / 600 = 0.01388 ms = 13.88 μs

d)  Total average time to satisfy a request is calculated as :

Average seek time + Average rotational latency + Transfer time for a sector

= 149.99 ms + 4.165 ms + 0.01388 ms

= 154.168 ms

4 0
3 years ago
The critical path in a project network is:______ A. The Shortest path through the network. B. Longest path through the network.
Softa [21]

Answer:

B

Explanation:

4 0
3 years ago
Other questions:
  • Choose all statements that identify the benefits of programming design.
    10·2 answers
  • It is important for a writter to include voice and point of view in writting because _______
    11·1 answer
  • If a pedestrian begins to cross my path when i have the right of way
    5·1 answer
  • What provision of the Government Paperwork Elimination Act was designed to encourage a paperless society?
    8·2 answers
  • A member function of a derived class may not have the same name as a member function of a base class
    9·1 answer
  • In a distributed database system, the data placement alternative with the highest reliability and availability is Group of answe
    9·1 answer
  • How do you answer questions
    15·1 answer
  • 4.15 LAB: Password modifier
    14·1 answer
  • which of the following can be represented by a sequence of bits. 1. An integer 2. An alphanumeric character 3. A machine languag
    12·1 answer
  • Write a Dice Game program that generates two random dice values between 1 and 6 for you, and 2 for the computer. You get to roll
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!