Answer:
C. 37.5 minutes
Step-by-step explanation:
You can set up a proportion to help you figure this out.
12/15=30/x (in this proportion, the number of laps are both on the numerator and the time it takes her is on the denomiator.)
Now, just cross multiply and your equations should be: 12·x=15·30, which equals to 12x=450.
Divide 12 on both sides and x=37.5
The product of the sum of the their rates and the time it took them to finish the job should be equal to one whole job. This may be expressed by the equation,
(1/9 + r) x 6 = 1
Solving for the value of r gives an answer of r = 1/18. Thus, Hector does 1/18 of the job in 1 hour.
Answer:
3
Step-by-step explanation:
As the CD line is parallel to x-axis hence the separation or length is measured on the x-axis i.e.
the length of CD = length of C - length of D = 7 - 4 = 3
It's a proportion.
2 is to x as 15 is to 9, or 2/x = 15/9.
Multiply the means and extremes
15x = 18
divide both sides by 15 to get x by itself.
x = 1.2