1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Luden [163]
3 years ago
8

What is the y-intercept

Mathematics
1 answer:
horsena [70]3 years ago
4 0

it is 5.

but wth is x intercept

You might be interested in
If a video is getting 5,000 views every 10 minutes, how long will it take to reach 60,000 views?
adelina 88 [10]

Answer:

60,000÷5000=12

12×10=120 minutes.

5 0
3 years ago
What is one and one half times one and three fourths​
Lisa [10]

Answer:2.625 also 2 5/8

Step-by-step explanation:

4 0
3 years ago
Read 2 more answers
Which physical feature is shown?
alukav5142 [94]

Answer:

APPALACHIAN MOUNTAINS

HAVE A BEAUTIFUL DAY

PLEASE MARK THIS ANSWER AS THE BRAINLIEST

6 0
3 years ago
What is 4 a whole number as a fraction<br><br> note: this is for my little sister!
bonufazy [111]

Answer:

4/1

Step-by-step explanation:

Dividing any number by 1 gives you the same number, therefore 4/1 is the fraction form.

4 0
3 years ago
A furniture shop refinishes chairs. Employees use two methods to refinish chairs. Method I takes 0.5 hours and the material cost
sveta [45]

Answer:

With Method I, they should plan to refinish 92 chairs and with Method II they should plan to refinish 70 chairs.

Step-by-step explanation:

This problem can be solved by means of a system of equations, that is to say a system that in this case will contain 2 linear equations with two variables: "x" and "y".

First you must define what your variables x and y are:

  • x: Chairs refinished by method I.
  • y: Chairs refinished by method II.

On the one hand, you know that between method I and method II they plan to work 151 hours. In method I, each chair takes 0.5 hours of work, this means that to obtain the total amount of time it takes to work in the "x" chairs by this method, 0.5 must be multiplied by the number of chairs. You can apply the same reasoning to calculate the total amount of time it takes to work on the "y" chairs by method II knowing that each chair takes 1.5 hours. Everything said above is represented by the equation:

<em>\frac{1}{2} *x+\frac{3}{2} *y=151 Equation (A)</em>

In the equation the values ​​0.5 and 1.5 are represented in the form of a fraction (1/2 and 3/2 respectively) to be able to solve more in a way how the system of equations.

On the other hand, to state the other equation of the system, it must be taken into account that by method I the material costs $ 9 for each chair and by method II the material costs $ 7 for each chair. To determine the value of the material in each method, multiply the value of each chair by the amount of chairs refinished in each case. And the sum of the value of the materials of both methods must be $ 1318. This is represented by the equation:

<em>9*x+7*y=1318 Equation (B)</em>

Having both equations, you can solve the system. There are several methods to solve it, but one of the easiest and most widely used methods is substitution. This consists of isolating one of the variables from one of the equations and replacing it in the other equation.

In this case you can choose to isolate the variable x from equation B, resulting in:

x=\frac{1318}{9} -\frac{7}{9} *y <em>Equation (C)</em>

It is always preferable to work in fractions for convenience to solve the calculations.

Now you replace the expression obtained from x in equation A, obtaining:

\frac{1}{2} *(\frac{1318}{9} -\frac{7}{9} *y)+\frac{3}{2} =151

Now you have an equation with a variable, "y", which can be solved, that is, you can get the value of "y". So "y"=70

Remembering that the variable "y" is the number of chairs refinished by method II, <u><em>the value of "y" means that 70 chairs by that method were refinished</em></u>.

To calculate the value of "x", you simply replace the value of "y" in either of the two equations (A) or (B) of the system and solve the equation. Or you can replace the value of "y" in equation (C): Either way the result must be the same: "x"=92

Remembering that the variable "x" is the number of chairs refinished by method I, <u><em>the value of "x" means that 92 chairs by that method were refinished.</em></u>

6 0
3 years ago
Other questions:
  • How to solve 325x52 traditional way
    15·1 answer
  • Two parallel lines are crossed by a transversal.
    11·2 answers
  • Is this perpendicular or parallel or neither y = -4/5x+3 And 4x -5y=-15
    15·1 answer
  • Which equation is equivalent to the equation 5X+30=45?
    6·1 answer
  • Find the outlier in the set of data.
    12·2 answers
  • WILL GIVE BRAINLIEST. ALGEBRA 1
    10·2 answers
  • An equation is shown below...
    10·1 answer
  • Find the distance between points (0,-8) and (3,-2)
    11·2 answers
  • Can you help me with this problem please. I will mark brainlist
    14·2 answers
  • Alex paid $6 for renting a movie for 3 days. Which graph shows the relationship between the costs of renting a movie for differe
    9·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!