Answer:
2
Step-by-step explanation:
5 feet + 12 inches = 2 yards
Therefore
5 feet + 12 inches = yard(2)
I solving for (s)
hope that helps
O * o
_________________________________________
l l l l l l l l l l l l l l l
-7 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7
As you can see on the number line, both -7 and 7 are each 7 units away from 0.
Answer:
M(B(h))=78.18025h
Step-by-step explanation:
First we have the following equations:
L(h) = 28.75h eq. 1
B(L) = 1.78L eq. 2
M(B) = 1.43B eq. 3
To find the selling price based on the estimated number of hours, we need to start replacing equation 1 in equation 2 as:
B(L) = 1.78*B
B(L(h)) = 1.78*(28.75h)
B(L(h)) = B(h) = 51.175h eq. 4
Finally, if we weplace equation 4 in equation 3, we get:
M(B) = 1.43B
M(B(h)) = 1.43*(51.175h)
M(B(h)) = 73.18025h
So, the composite function that can be used to find the selling price for the labor portion of a bid based on the estimated number of hours is:
M(B(h)) = 73.18025h
A linear function is a trend that is equal to each other or corresponds to another set of numbers. The answer here would be C. because the multiples properly align in the table.