<span>If you specify a user without specifying a hostname, mysql will </span>automatically put a percent sign (%) the host to show that the user can connect from any host.
Answer:
Maintenance Phase
Explanation:
One of the concepts employed in project management for describing stages involved when carrying out an information system development project is the systems development life cycle (SLDC). The cycle which starts from carrying out a feasibility study and ends in maintenance is a highly used conceptual model. There are 5 major stages or phase and they are the; Requirement Phase, Design Phase; Implementation Phase, Test Phase, and the Maintenance phase. The maintenance phase comes when testing has been complete and all enhancement and modifications have already been developed, and the system is operating.
Answer:
7 page faults
Explanation:
I have created a small Java program that can be seen in the attached picture below. This Java program uses an LRU algorithm in order to find the number of page faults within an array of page references from the references given in the question. Using these references, and the java program we can see that there are a total of 7 page faults. This can be seen in the output highlighted by red in the picture below.
Answer:
The total const is 13025 KWh
Explanation:
These are the steps to solve this problem:
- Convert all the powers from W to KW dividing by 1000.
- Convert all the times on minutes to hours dividing by 60.
- Then you can apply energy consumption formula
for any of the appliances. the results will be at KWh. - Sum all the consumtions and you will have the total cost.
Attached you will have a spreadsheet as a guidance. Any questions, just let me know.
The most prominent
Company name that's most important