Answer: 24th
7-14-21
3-6-9-12-15-18-21
plus the three extra days gets you the 24th
Answer:
The right answer is (a) 4x^2 +90x
Step-by-step explanation:
Thanks alot for this question :)
She did 14 jumps on her fourth trip, and on her twelfth trip she did 30 jumps. Just add 2 jumps starting with 6.
(4 qt = gal)
120 gal./min.
Multiply 120 by 4.
120(4) = 480 qt.
The pool is being drained at a rate of 480 qt./min.
there are 60 min in a hour
multiply 480 by 60
480(60) = 28,800 qt/hr
The pool is being drained at a rate of 28,800 qt./hr. (quarts per hour)