Answer:
johnny joestar is the best jojo and thank you for the points
Explanation:
Don't have a good day, have a GREAT day ;)
The building of a hacker rank is one that cost a lot of money and as such the minimum cost is 4.
What is the minimum cost?
The minimum cost is the lowest cost that is needed to complete a building. It depends on:
- The cost of each type of house to be built (e.g. cost of a wood house, cost of a brick house, etc.)
- The number of the type of house to be built e.g. 2 03 3 or even more.
When one is given input such as : [[1,2,3],[1,2,3],[3,3,1]] (the values in column stands for the cost of materials)
The output : 4
So you have to:
Select material-1 of cost 1 in first house(row)
Select material-2 of cost 2 in second house(row)
Select material-3 of cost 1 in third house (row)
total = 1+2+1 -> 4
Learn more about construction from
brainly.com/question/1316149
When genetic molecules are broken down and deciphered under a large scale then the defects can be magnified and researched and further stopped. Hopefully with the scientific advancements at hand and with enough people to come forward to participate in the study these diseases and genetic defaults will cease.