The early finish time for activity T is 29
Explanation:
Activity time for T is 7
Assuming the early start time is 22,
Early finish time = 22 + 7 = 29
1) Road
accident officials may visit the claimant in person, to confirm the
authenticity of the claim.
<span>2) The
RAF should reinstate their existing system (the fault-based compensation
system) with a new system proposed in the high court, called the Road Accident
Fund Benefit Scheme (RABS) – a no fault benefit system – that will pardon the
affected driver from civil liability.</span>
<span>3) Certify
that there is slight intermediary intervention as possible. For instance, lessen
the amount that lawyers take as a cut from pay-out.</span>
<span>4) Utilize more efficient employees, who can make
certain that the administrative side of the RAF runs as reasonably and smoothly
as possible, with as little deceitful behavior and corruption as possible. </span>
<span> </span>
The level which indicates the point of maximum economic efficiency IS THE LOWEST POINT ON AVERAGE COST CURVE.
The average cost curve is the curve that graphically represents the relationship between average cost by a company and the product produced. The point of maximum efficiency on the curve is the lowest point on the curve.
Answer:
B. Limits the actions of the borrower.
Explanation:
A protective covenant is a kind of loan covenant that limits the borrower from taking certain activities in the entire term of the loan to secure the lender's advantage.