Answer:
You didn't post image, but function is linear when its graph isn't curve line.
Answer:
B. -1/12
Step-by-step explanation:
1/2 - 5/6 + 1/4 = -1/12
Lol nice. to find the ribbon question we see that it says 5 meters. we divide this by 5. So x=$4/5
x= the cost of each meter. Simplify that and you will get $0.8 m\
now convert it to mm.
$0.8m x 1m/ 1000mm which equals 0.0008.
Coin: 50%; 1/2 chance to get heads
dice: 17%; 1/6 chance to get 2
Answer:
Team 3 Turtle, by 4 minutes
Step-by-step explanation:
The speeds of each of the turtles can be computed from ...
speed = distance/time
Then for each of the turtles, the training pace is ...
Team 1 Turtle: (18 ft)/(6 min) = 3 ft/min
Team 2 Turtle: (12 ft)/(4 min) = 3 ft/min
Team 3 Turtle: (10 ft)/(2 min) = 5 ft/min
The times required to cover the 30 ft distance at these paces are ...
time = distance/speed
3 ft/min ⇒ (30 ft)/(3 ft/min) = 10 min
5 ft/min ⇒ (30 ft)/(5 ft/min) = 6 min
The 2nd-place finishers will take 10-6=4 minutes longer.
The expected winner is Team 3 Turtle by 4 minutes.