Answer:
A then B then C
Explanation:
The pattern that is most similar to how stages are related in Atkinson and Shiffrin's information-processing model would be "A then B then C". This is because just like this pattern, Atkinson and Shiffrin's information-processing model deals with each stage in a linear pattern, meaning that one needs to happen in order for the other to take place.
don't have favorites but I like most of all the manhwa/comics I've read
The best way to explain the difference is option A: Jitter is the up and down variation in latency.
<h3>What are VoIP services?</h3>
Voice over Internet Protocol (VoIP), is known to be a form of a technology that gives one room to be able to make voice calls via the use of a broadband Internet connection.
In the case above, The best way to explain the difference is option A: Jitter is the up and down variation in latency as it is the only best option.
See options below
Jitter is the up and down variation in latency.
Latency is the up and down variation in jitter.
Jitter is caused by an inadequate codec.
Latency is caused by sampling; jitter is not.
Learn more about latency from
brainly.com/question/27013190
#SPJ1
Making a prototype is a great example of double checking. A prototype is the first made, which means it'll be tested. If a prototype was untested when complete, then it would be exceptionally harder to determine that everything is in working condition. No matter how skilled someone is.
In fact, skilled workers would prefer to test their prototypes to make sure it works. That way they'd stay on top.
Sean is using FUNCTION POINT (d) method for forecasting the time and cost of developing a customized software program by looking at the number of inputs, outputs, inquiries, files, and interfaces.
Explanation:
- The function point is a "unit of measurement" to express the amount of business functionality an information system (as a product) provides to a user.
- The outcome of a function point count provides the metric 'unit of software delivered' and can be used to assist in the management and control of software development, customisation or major enhancements from early project planning phases, through to the ongoing support of the application.