Answer:
B. $2,000
Explanation:
Given;
Total cost of ending inventory = $9,000
Total number of units = 600
Over heads cost = $3,000 and the overhead rate is 75% of direct labor
Let direct labour cost be y
75% × y = 3000
3y/4 = 3000
y = 4 × 3000/3
y = $4,000
Total Inventory cost = direct material cost + direct labour cost + overheads
9000 = direct material cost + 4000 + 3000
direct material cost = 9000 - 7000
= $2,000
Answer:
The correct answer is A. The Mars Climate Orbiter crashed on the surface of Mars because one program output thrust in terms of foot-pounds, and another program expected thrust to be expressed in terms of newtons.
Explanation:
The Mars Climate Orbiter was NASA’s unsuccessful mission to study the Martian climate, part of the Mars Surveyor 98 program. The MCO was created as a satellite-translator for the Mars Polar Lander lander, and after the latter ceased to function, it was supposed to study the Martian climate.
The Mars Climate Orbiter was destroyed when a navigation error caused the probe to be improperly elevated as it entered orbit. The vehicle was destroyed by the friction and stresses in Mars' atmosphere. An investigation showed that some data for the rocket system were calculated in English units (pound-force-second) while the navigation team expected SI units (Newton-second).
The total damages is calculated by adding the damages and the cash grants:
1800 + 4000 + 56000 = 61800
The insurance company will cover according to the policy 50/100/10
1800(0.5) + 4000(1.0) + 56000(0.01) + 250 = 5710
The office furnishing will be responsible for the difference:
61800 - 5710 =$56,090
Answer: the right to be heard
Explanation:because you need public opinion to get in idea for something
Answer:
Yes, If not more important than the internal post-project meetings.
Explanation:
The end of the execution phase of a project is not actually the completion of a project because there must be verification by both the executioner company and the customer or sponsor who awarded the project.
The verification of whether the execution of the project was done according to pre-execution standards set in the project planning phase in terms of 'project scope' 'project time' and 'project cost' will have to be done by the company as a way of self-assessment but ultimately by the sponsor. It is arguable that the sponsor is the stronger voice in the project execution assessment stage because 'he who pays the piper dictates the tune'.
The reasons why such post-project evaluation meeting with the customer is important is that:
1. Project Scope: The customer has to certify that the benefits to be delivered by the project are actually been delivered, which is the reason why the project was awarded in the first instance.
2. Project Time: The customer will have to agree that the project has been carried out within the agreed time-frame, and there will be no penalties for delay in execution of the project. Penalties for time-delay in project execution could carry significant consequences as the customer could trigger the liquidated damages clause in the contract.
Project Cost: Another point of consideration is whether or not the project has been done within budget.
All of these considerations have to be made between both parties before a successful project handover.