Answer:
The beta of the new project is 1.475
Explanation:
The beta is the measure of systematic or market risk associated to a stock. The beta is used in the calculation of the required/expected rate of return under the CAPM model. The CAPM model uses the following formula to calculate the required/expected rate of return,
r = rRF + Beta * (rM - rRF)
Plugging in the available variables, we can calculate the value of the beta.
0.154 = 0.036 + Beta * (0.116 - 0.036)
0.154 - 0.036 = Beta * 0.08
0.118 / 0.08 = Beta
Beta = 1.475
The decision to build the park or not would be based solely
on the cost – benefit relationship of this project. Since there is no other
factor considered in this problem, you only need to see if the benefit of
constructing the park would exceed its cost. In this problem, the cost to
construct the park is $20,000 while the marginal benefit would be $24,000
($8,000 x 3 families that can benefit from this project). Therefore, you can
say that the benefit has exceeded its cost. As a conclusion, the neighborhood
park should be built because it benefits the families living in that area more
than its cost.
Answer:
See explanation below as attached.
Explanation:
1. Predetermined overhead is 139% of direct labor hour
2. Under applied overhead is $6,200
Please find attached breakdown and solution to question 1, 2, 3, 4 and 5.
Answer:
The price elasticity of demand for icecream is -0.75, that means that is inelastic.
Explanation:
Price elasticity of demand measures the porcentage of the change in the demand when there is a change in the price. If the change in porcentage of the demand is less than the pocentage of change in the price we talk about inelastic demand. An increase in the price of inelastic goods will result in bigger revenues, as the porcentage in the drop of sales is less than the porcentage of increase in the price.
The formula is: % in change demand/% in change of price
-3%/4= -0.75
The minus symbol indicates that when the price rises the demand decrease.