Answer:
Step-by-step explanation:
x2 + 10x + 25
x2 + 5x + 5x + 25
x (x + 5) + 5(x + 5)
(x + 5) (x + 5)
A percentage is a number out of 100. So, 17.5% is really 17.5/100, or 0.175.
To find 17.5% of 1500, you multiply 1500 by 0.175
1500 x 0.175 = 262.5.
The commission is $262.50.
Then the lest multiple of 6 and 8 are 5 and 7 duh
Given that the cubical piece has side (s) 7 mm, and a cylindrical hole of diameter (d) as 3 mm.
The volume of the piece can be calculated as,

It is mentioned that the material costs $207 per cubic meter, so the cost (c) of 1 piece is calculated as,

This is the cost (in dollars) for 1 piece.
Given that the manufacturer wants to produce 1,000,000 such pieces, so the total cost (TC) is calculated as,

Thus, the total prototypes will cost around $60.75
<span>The right answers would be B (7 miles after marker 58)
and C (7 miles before marker 58). The problem doesn't say if the rest area is going to be built 7 miles before milepost 58 or 7 miles after it.</span>