It will take them 5 Hours to charge the same. The rental charge will be 510.
I did a manual computation per company: My computation is entirely based on trial and error.
Red Bus Co. has a fixed rental rate of 150 and additional rental of 72 per hour while Blue Bus Co. has a fixed rental rate of 240 and additional rental of 54 per hour. Both fixed rental rate are one time charges only and total rental will vary on the number of hours spent in using both vehicles.
Let's start with the Red Bus Co. I will be posting the charges per hour and its running balance. The running balance is the sum.
Fixed Rate 150 Running Balance: 150 => 150 + 0
Hr 1 72 222 => 150 + 72
Hr 2 72 294 => 222 + 72
Hr 3 72 366 => 294 + 72
Hr 4 72 438 => 366 + 72
Hr 5 72 510 => 438 + 72
I'll do the same process with Blue Bus Co.
Fixed Rate 240 Running Balanc: 240 => 240 + 0
Hr 1 54 294 => 240 + 54
Hr 2 54 348 => 294 + 54
Hr 3 54 402 => 348 + 54
Hr 4 54 456 => 402 + 54
Hr 5 54 510 => 456 + 54
Answer:
The length of new ramp is 49.03 ft.
Step-by-step explanation:
It is given that 26 ft long ramp is used to reach 10 ft up a wall. The ramp covers a horizontal distance of 24 ft.
If the horizontal distance is doubled, then the horizontal distance is 48 ft. The height remains same. Therefore the height of ram is 10 ft.
Use pythagoras in new right angle triangle.






Therefore the length of new ramp is 49.03 ft.
Answer:
c is your answer to the question
Answer: y=-4x+11
Step-by-step explanation:
1. use formula y=mx+b
2. find the slope
3. plug in one of the points to find y int
Answer:
the answer is b=7
b
=
−
7
b
−
12
=
−
61
=
=
−
61
Step-by-step explanation:
mark me brainliest
pls and ty