Answer:
Pros and cons are for every method listed below. A person can only see his strength and power during self assessment and he may ignore all his mistakes as it can be his over confidence in himself. Graphic rating may be disappointing as many employees can get same rating and there will not be any difference among them in the pay rise.
Explanation:
There are four major performance appraisal tools
1. Self assessment
2. Graphic Rating
3. Behavioral Checklist
4. 360 degree feedback
I believe it would be C.) multiple installations of gas, water, and electric lines
Answer:
A. The seller would be primarily liable.
Explanation:
Subject to basis is a form of home buying options in real estate. It is a situation where the buyer takes over existing loan of a seller and make commitment to seller to continue repaying the loan to the lender.
Though the buyer will taken over the loan from the seller and make repayment to the lender, there is no legal obligation on buyer`s part that makes him/her liable to the lender. The seller still remain liable despite the the taking over. So option A is right while B to D is wrong because it`s only the seller that is primarily liable to the lender.
Answer:
The total loss in welfare to the economy will be -$32.
Explanation:
By intersecting the supply function QS to the demand function QD, we will find the equilibrium price:
QD = QS
16P - 8 = 64 - 16P
16P + 16P = 64 +8 =
32P = 72
P = $2.00
Replacing the equilibrium price either in QS or QD, we foind the equilibrium quantity:
QS = 64 - 16*2 = 64 -32
QS = 32
In this case the total revenues at the equilibrium price RE will be:
RE = 32 * $2 = $64
On the other hand if the government imposes a price floor at $3.00, then the new total revenues RN will be:
RN = 32 * $3 = $96
Therefore the total losses is find by subtracting the revenue at the goverment price floor RN to the revenue at the equilibrium price RE:
LT = RE - RN
LT = $64 - $96 = -$32
Answer:
Predetermined manufacturing overhead rate= $37.28 per direct labor hour
Explanation:
Giving the following information:
Estimated overhead= 3,700,000 + 960,000= $4,660,000
Estimated direct labor hours= 125,000
<u>To calculate the predetermined manufacturing overhead rate we need to use the following formula:</u>
<u></u>
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Predetermined manufacturing overhead rate= 4,660,000/125,000
Predetermined manufacturing overhead rate= $37.28 per direct labor hour