1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Bogdan [553]
2 years ago
6

Raju, ramu and razi can do a piece of work in 20, 30 and 60 days respectively depending on their capacity of doing work. If raju

is assisted by ramu and razi on every third day, then in how raju will complete the work?.
Mathematics
2 answers:
jok3333 [9.3K]2 years ago
8 0

If Raju is assisted by Ramu and Razi every third day, then the number of days in which Raju will complete the work is 15 days.

<h3>What is Division?</h3>

The division is one of the four fundamental arithmetic operations, which tells us how the numbers are combined to form a new one.

Let the total unit of work be 60 units.

Given that Raju, Ramu, and Razi can do a piece of work in 20, 30, and 60 days respectively. Therefore, the rate at which three of them works can be written as,

Rate = Total Work/ Time

Rate of Raju = 60 units /20 days = 3 units per day

Rate of Ramu = 60 units /30 days = 2 units per day

Rate of Razi = 60 units /60 days = 1 units per day

The work completed on the first day will be,

Work completed = Rate × Time

                         = Rate of Raju × 1 day

                         = 3 units per day × 1 day

                         = 3 units

The work completed on the second day will be,

Work completed = Rate × Time

                         = Rate of Raju × 1 day

                         = 3 units per day × 1 day

                         = 3 units

The work completed on the third day will be,

Work completed = Rate × Time

                         = (Rate of Raju+ Rate of Ramu + Rate of Razi) × 1 day

                         = (3+2+1) units per day × 1 day

                         = 6 units

Therefore, every three days, 12 units every three days of work will be completed. Therefore, the number of times three of them need to work together is,

Number of times = 60 units / 12 units every three days = 5

Further, the number of days if they meet 5 times is,

Number of days = 3 × 5 = 15

Hence, If Raju is assisted by Ramu and Razi every third day, then the number of days in which Raju will complete the work is 15 days.

Learn more about Division here:

brainly.com/question/369266

#SPJ4

mart [117]2 years ago
6 0

Raju will complete the work in 15 days.

<h3 /><h3>What is fraction?</h3>

A fraction is a part of a whole. In arithmetic, the number is expressed as a quotient, in which the numerator is divided by the denominator. In a simple fraction, both are integers. A complex fraction has a fraction in the numerator or denominator.

Given:

Raju work = 20 days

Ramu work = 30 days

Razi  work = 60 days

now, On 1st day= 1/20th part of the work done

On 2 days, 1/10th part of the work done.

On third day, Raju worked with Ramu and Razi.

=1/20 + 1/30 + 1/60

= 1/10  part of the work done.

so, In 3 days

=1/10 + 1/10

=1/5th part of the work completed

In percentage it is 20% of total work(100%)

Then, this can be written as

20% = 3days

20% x 5 = 3 x 5 days

100% = 15 days

Hence, Raju will complete the work in 15 days.

Learn more about fraction here:

brainly.com/question/24108283

#SPJ4

You might be interested in
A football field is 120 yards long by 53yr wide. If a player runs diagonally from one corner to the opposite corner, how far wil
Fed [463]

Answer:

They will travel about 131.18 yards.

Step-by-step explanation:

7 0
2 years ago
3log54+5log50-3log2-5log2
jonny [76]
3log54 + 5log50 - 3log2 - 5log2 = log((54^2 x 50^2)/(2^3 x 2^5)) = log((2,916 x 312,500,000)/(8 x 32)) = log 3,559,570,313 = 9.55
6 0
4 years ago
Given the function g(x) = x^2+ 10x + 23, determine the average rate of change of
ohaa [14]

Answer:

34

Step-by-step explanation:

3 0
3 years ago
How do you find the area of a triangle
beks73 [17]

Answer:


Step-by-step explanation:

Area=(1/2)*base *height

3 0
4 years ago
Read 2 more answers
This diagram shows the dimensions of a concrete piece used to build a deck.
Inga [223]

Answer:

V=1,840in

Step-by-step explanation:

divide the shape into 2 rectangles  V=l x w x h  find the volume for the 2 rectangles and then add the answers

5x8x10=400

20x8x9=1,440

400+1,440=1,840in

6 0
3 years ago
Other questions:
  • 1. Which point on the axis satisfies the inequality y
    6·1 answer
  • How many terms does the polynomial have?
    9·1 answer
  • Ellie has 5 cups of yogurt to make smoothies. Each smoothie uses cup of yogurt
    11·1 answer
  • How to solve function operations
    9·1 answer
  • The tape diagram represents an equation.<br> y<br> y<br> 7<br> Write an equation to represe
    9·1 answer
  • Roman numbers*
    12·1 answer
  • Which expression does not belong? Be prepared to explain your reasoning.
    6·2 answers
  • What is the solution to log Subscript 5 Baseline (10 x minus 1) = log Subscript 5 Baseline (9 x + 7)
    9·2 answers
  • A ladder is placed 5 feet away from a house. The ladder comes up to 12 feet on the side of the house. How long is the ladder? Pl
    8·2 answers
  • Sin^2x - 4sinx - 5 = 0<br> Please answer this. I want specific step-by-step instructions. THANKS!
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!