Answer:
First shift - 1101
Second shift - 0110
Third shift - 1011
Fourth shift - 1101
Fifth shift - 0110
Sixth shift - 1011
Explanation:
Each time you shift a register to the right, you do 3 things:
- The rightmost digit drops off
- You move the next three digits over one position to the right
- You fill in the leftmost position with one of the numbers from your serial input.
Contents are initially 1011. The 1 on the right disappears. The leftmost 3 digits (101) end up in the last 3 positions of the register. The first position of the register takes a number from the serial input, which is 1 in this case. So you end up with 1101.
Do this a second time. The rightmost 1 is gone, the 110 end up as the last 3 positions of the register, and you end up with 0 in the leftmost position. This one is 0110.
The remaining 4 follow the same pattern.
Answer:
A. Back up software - Utility software
B. Printer - Device drivers
C. Camera - Firmware
D. Television - Firmware
E. Games console - Firmware
F. Antivirus software - Utility software
G. Disk Cleaner - Utility software
H. Video Card - Device drivers
Explanation:
Computer system components are the physical or hardware and software parts of the device. It is a combination of system software like utility software, device drivers and firmware, application software, and the hardware components and kernel.
To move one slice of a pie chart away from the pie creates a(n) ____. exploded pie chart
Answer:
Trunk
Explanation:
Gigabit switches are meant for expanding the ethernet. Through this, you can add more PC to the ethernet. A managed switch is meant for providing more tailored features and tools to the users. The unmanaged switch only allows the two devices on the network to communicate with each other, as it just provides the connectivity. And for setting up the VLANs on it, we need the Trunk Switch. And hence, the correct option is Trunk.