C.........................
Answer:
700%
Step-by-step explanation:
35/5=7
7.00
Answer:
$16,000
Step-by-step explanation:
This is because 5 is the thousand place and the hundredth place is more than 5 so, it rounds up (to 16000)
<em>Feel free to mark this as brainliest :D</em>
Answer:
B
Step-by-step explanation:
The function -x^4 + 1 is a polynomial graph. As such it has specific characteristics or behavior you can expect to see:
- It's leading coefficient is -1. This means the graph changes direction. Both ends of this graph face down into negative infinity.
- Its degree is 4 meaning it is an even graph. This means both ends end the same way and NOT opposite directions.
In conclusion, this graphs has ends which end the same direction and both face down.
Answer:
$456.45 should be budgeted.
Step-by-step explanation:
Normal Probability Distribution:
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Mean $440 and standard deviation $10.
This means that 
How much should be budgeted for weekly repairs and maintenance so that the probability the budgeted amount will be exceeded in a given week is only 0.05?
This is x for which
P(X > x) = 0.05
So this is the 100 - 5 = 95th percentile, which is X when Z has a pvalue of 0.95, so X when Z = 1.645.




$456.45 should be budgeted.