Answer:
$68.48
Step-by-step explanation:
You want to find cost such that ...
6.25% × cost = $4.28
Dividing by the coefficient of cost, we get ...
cost = $4.28/0.0625 = $68.48
Answer:
x = 13.5°
Step-by-step explanation:
Angles 2 + 3 = a straight line, so 180°
180 - 66 = 114 = angle 2
114 = 10x - 21
114 + 21 = 10x
135 = 10x
135 / 10 = x
13.5 = x
Your y-intercept would be (0,-13)
The distance of the point <span>(8, 3.25) </span>to the x-axis (the horizontal line) is 3.25.
incorrect - A.) is 4.75 away from the x-axis
This one is correct - B.) is 3.25 away from the x-axis
incorrect - C.) is 7 away from the x-axis
incorrect - D.) Actually one of the above answers it correct
Hope this helps
One JOB = 1 and 2 hours = 120 min
Tyler Rate per minute: 1/120 (in 1 minute he performes 1/120 of the job)
Dakota<span> Rate per minute: 1/90 (in 1 minute he performes 1/90 of the job)
Tyler's + Dakota's rate per 1 minute = 1/120 + 1/90 = 7/360 (Job/minutes)
7/360 of the job was performed in 1 minute
</span>a complete JOB =1 to be performed in x minutes (Rule of three)
x = 1x1/(7/360) that equals to 360/7 and x (time of both) = 51 min 42