<h3>
Answer: (2,0)</h3>
Explanation:
The vector (0,2) points directly north and the length of this vector is 2 units. It's the distance from (0,0) to (0,2).
When rotating 270 degrees counterclockwise, we'll turn to the left or westward direction (90 degrees so far) then at some point aim directly south (180 degrees so far) and finally ultimately end up pointing directly east (after getting to 270). So that's how we go from (0,2) to (2,0).
If you were to go clockwise, then everything flips and you'll ultimately end up pointing directly west. The length of the vector stays the same the whole time.
Answer:
7 laps
Step-by-step explanation:
Answer:
x>4
Step-by-step explanation:
2x>4(3x-5)-20
2x>12x-20-20
2x>12x-40
2x-12x>-40
-10x>-40
x>4
Answer: 8 minimum work stations is what would be needed.
Step-by-step explanation:
The cycle time is computed as the operating time daily divided by the scheduled output.
It is important to note that the daily capacity of the operation layout is the operating time divided by the cycle time.
Therefore,
If you need to produce 30units/hour.
The average cycle time is as follow:
The average cycle time is the average time between the completions of units.
60/30= 2 average cycle time
=16/2
=8
8 work stations is the minimum number that would be needed.
It is important to know that in an assembly line balancing, the minimum number of work station is the ratio of the sum of all tasks time to the cycle time.
Answer:
5; 10; 20.
Step-by-step explanation:
the 1st step is shown with orange colour, described on the right part; the 2d step is shown with blue colour, described on the right part of the picture.