1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
astra-53 [7]
3 years ago
12

An article presents a new method for timing traffic signals in heavily traveled intersections. The effectiveness of the new meth

od was evaluated in a simulation study. In 50 simulations, the mean improvement in traffic flow in a particular intersection was 655.6 vehicles per hour, with a standard deviation of 311.7 vehicles per hour. A traffic engineer states that the mean improvement is between 583.1 and 728.1 vehicles per hour. With what level of confidence can this statement be made? Express the answer as a percent and round to the nearest integer.
Mathematics
1 answer:
Anna35 [415]3 years ago
6 0

Answer:

With 89.9% we can say that the mean improvement is between 583.1 and 728.1 vehicles per hour.

Step-by-step explanation:

We are given that the effectiveness of the new method was evaluated in a simulation study. In 50 simulations, the mean improvement in traffic flow in a particular intersection was 655.6 vehicles per hour, with a standard deviation of 311.7 vehicles per hour.

A traffic engineer states that the mean improvement is between 583.1 and 728.1 vehicles per hour.

<em>Let </em>\bar X<em> = sample mean improvement</em>

The z-score probability distribution for sample mean is given by;

            Z =  \frac{\bar X-\mu}{\frac{\sigma}{\sqrt{n} } } ~ N(0,1)

where, \mu = mean improvement = 655.6 vehicles per hour

            \sigma = standard deviation = 311.7 vehicles per hour

            n = sample of simulations = 50

The Z-score measures how many standard deviations the measure is away from the mean. After finding the Z-score, we look at the z-score table and find the p-value (area) associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X.

Now, Probability that the mean improvement is between 583.1 and 728.1 vehicles per hour is given by = P(583.1 < \bar X < 728.1) = P(\bar X < 728.1) - P(\bar X \leq 583.1)

  P(\bar X < 728.1) = P( \frac{\bar X-\mu}{\frac{\sigma}{\sqrt{n} } } < \frac{728.1-655.6}{\frac{311.7}{\sqrt{50} } } ) = P(Z < 1.64) = 0.9495

  P(\bar X \leq 583.1) = P( \frac{\bar X-\mu}{\frac{\sigma}{\sqrt{n} } } \leq \frac{583.1-655.6}{\frac{311.7}{\sqrt{50} } } ) = P(Z \leq -1.64) = 1 - P(Z < 1.64)

                                                            = 1 - 0.9495 = 0.0505                      

<em />

<em>So, in the z table the P(Z </em>\leq<em> x) or P(Z < x) is given. So, the above probability is calculated by looking at the value of x = 1.64 in the z table which has an area of 0.9495.</em>

Therefore, P(583.1 < \bar X < 728.1) = 0.9495 - 0.0505 = 0.899 or 89.9%

Hence, with 89.9% we can say that the mean improvement is between 583.1 and 728.1 vehicles per hour.

You might be interested in
What is the effective interest rate on an account that earns 5.5% compounded monthly?
nataly862011 [7]

Answer:

.46%

Step-by-step explanation:

.055/12= .00458= .46%

4 0
3 years ago
Which expression is equivalent to (4−3)−6?
arsen [322]

Answer:

The given expression is equal to -5

Step-by-step explanation:

Given that:

= (4−3)−6

solving bracket first as 4 -3 equals 1

= 1-6

Subtracting greater term from smaller gives the negative value

= -5

So the given expression will be equal to -5

i hope it will help you!

5 0
4 years ago
Read 2 more answers
A mountain climber starts in a cave, then climbs up the mountain. After 1 hour, he is 6 m under ground. After 4 hours, he is 6 m
Nookie1986 [14]

Answer:

In Point Slope Form: y+6=4(x-1)

Step-by-step explanation:

<u>First you have to find the points given which are:</u>

  • (1, -6) and (4, 6)

<u>Label the points x1, y1, x2, and y2</u>

  • It already gives you the slope which is 4.

<u>Plot the points in the equation of Point Slope Form:</u>

<em><u>y1-y2=m(x-x1)</u></em>

  • y1-6=4(x-1)

<u>Simplify: y1-6=4x-4</u>

  • y=4x+2

<u>It doesn't ask you to simplify but why not!  </u>

3 0
4 years ago
How many solutions y= -2x -4 and y=3x plus 3
Oksi-84 [34.3K]

Answer:

The number of solutions is one

Step-by-step explanation:

Here, we want to get the number of solutions

since the linear equations are not the same, neither do they have the same x-variable, we can have only one solution

6 0
3 years ago
I have 4 congruent sides, but my diagonals are not congruent. What is my most specific classification?
Aleks04 [339]

Answer:

rhombus

Step-by-step explanation:

8 0
3 years ago
Other questions:
  • Plz help me I need your help I’m begging you plz help me plz I’m begging you so much plz help me I’m begging you you so much plz
    10·2 answers
  • A number divided by five is at least four
    9·2 answers
  • How do you find percent change??
    9·2 answers
  • Megan invests $1,500 in a certificate of deposit. Each year the certificate of deposit earns 1.3% interest. Does this situation
    13·1 answer
  • Find the solution to the system of equations
    12·1 answer
  • Write the standard form of the quadratic equation modeled by the points shown in the table below.
    7·2 answers
  • Help me
    14·1 answer
  • HURRY I NEED HELP!!!!!
    5·1 answer
  • For the limit
    9·1 answer
  • Find the equation of the line through (-7, -2) that is perpendicular to the line y = x/3+6.
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!