Well a half cup is 2/4 and if the serving size is 3/4 there is only 66.66% of the serving size needed hope this helps!
When they have no solutions, the lines are parlaell, or they have the same slope but different y intercept
example
3x+2y=2 and
3x+2y=4 are paralell
also
y=3x+2 and
y=3x+4 are also parlell, no solutions
infinite solutions are when they are the same line
they have the same slope and y intercept
to find out, simplify
3x+2y=4 and
6x+4y=8 are smae lien
also
y=3x+2 and
2y=6x+4 aer the same line
1 solution is when it is none of the above things
a normal thing, where the slopes are differnet
example
y=2x+2
y=3x+2
Answer:
Option C) 146.5
Step-by-step explanation:
We are given the following information in the question:
Mean, μ = 130 weeks
Standard Deviation, σ = 10 weeks
We are given that the distribution of completion time is a bell shaped distribution that is a normal distribution.
Formula:

P(X<x) = 0.95
We have to find the value of x such that the probability is 0.95
P(X < x)
Calculation the value from standard normal z table, we have,

The project should be completed in 146.5 weeks or less.
Hence, 146.5 weeks should be set the due date such that there is a 95 percent chance that the project will be finished by this time.
1) Find the radius of the circle. You can do that by inspection; no work required.
2) Use the "area of a circle" formula A = pi r^2 to calculate the area.
3) Round off your area calculation to the nearest hundredth.
Answer:
Matias divided 7.6 by 10 raised to the power of -2.
Step-by-step explanation:
Given : Matias preformed an operation with 7.6 and a number. He ended up moving the decimal point in 7.6 two places to the left.
To find : Matias divided 7.6 by 10 raised to the power of ?
Solution :
Matias preformed an operation with 7.6 and a number.
He ended up moving the decimal point in 7.6 two places to the left we have to multiply it with 0.01
i.e. 
So, Matias divided 7.6 by 10 raised to the power of -2.