1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
gregori [183]
4 years ago
8

Is this all correct?

Mathematics
1 answer:
shtirl [24]4 years ago
4 0
I can't read where your answers are can you send a better picture.:)))))))))))))
You might be interested in
Last month Maria hiked a total of 90 miles on two trails: a 5-mile mountain trail and a 10-mile canal trail. Let x represent the
ivolga24 [154]

Answer:

5x+10y=90

Step-by-step explanation:

6 0
3 years ago
Read 2 more answers
Find the work required to move an object in the force field F = ex+y <1,1,z> along the straight line from A(0,0,0) to B(-1
storchak [24]

Answer:

Work = e+24

F is not conservative.

Step-by-step explanation:

To find the work required to move an object in the force field  

\large F(x,y,z)=(e^{x+y},e^{x+y},ze^{x+y})

along the straight line from A(0,0,0) to B(-1,2,-5), we have to parameterize this segment.

Given two points P, Q in any euclidean space, you can always parameterize the segment of line that goes from P to Q with

r(t) = tQ + (1-t)P with 0 ≤ t ≤ 1

so  

r(t) = t(-1,2,-5) + (1-t)(0,0,0) = (-t, 2t, -5t)  with 0≤ t ≤ 1

is a parameterization of the segment.

the work W required to move an object in the force field F along the straight line from A to B is the line integral

\large W=\int_{C}Fdr

where C is the segment that goes from A to B.

\large \int_{C}Fdr =\int_{0}^{1}F(r(t))\circ r'(t)dt=\int_{0}^{1}F(-t,2t,-5t)\circ (-1,2,-5)dt=\\\\=\int_{0}^{1}(e^t,e^t,-5te^t)\circ (-1,2,-5)dt=\int_{0}^{1}(-e^t+2e^t+25te^t)dt=\\\\\int_{0}^{1}e^tdt-25\int_{0}^{1}te^tdt=(e-1)+25\int_{0}^{1}te^tdt

Integrating by parts the last integral:

\large \int_{0}^{1}te^tdt=e-\int_{0}^{1}e^tdt=e-(e-1)=1

and  

\large \boxed{W=\int_{C}Fdr=e+24}

To show that F is not conservative, we could find another path D from A to B such that the work to move the particle from A to B along D is different to e+24

Now, let D be the path consisting on the segment that goes from A to (1,0,0) and then the segment from (1,0,0) to B.

The segment that goes from A to (1,0,0) can be parameterized as  

r(t) = (t,0,0) with 0≤ t ≤ 1

so the work required to move the particle from A to (1,0,0) is

\large \int_{0}^{1}(e^t,e^t,0)\circ (1,0,0)dt =\int_{0}^{1}e^tdt=e-1

The segment that goes from (1,0,0) to B can be parameterized as  

r(t) = (1-2t,2t,-5t) with 0≤ t ≤ 1

so the work required to move the particle from (1,0,0) to B is

\large \int_{0}^{1}(e,e,-5et)\circ (-2,2,-5)dt =25e\int_{0}^{1}tdt=\frac{25e}{2}

Hence, the work required to move the particle from A to B along D is

 

e - 1 + (25e)/2 = (27e)/2 -1

since this result differs from e+24, the force field F is not conservative.

6 0
4 years ago
I need help with this please and thank you.
SashulF [63]

Answer: I believe the answer would be as follows:

8.431 grams

5.46 seconds

980 meters

900 miles

Step-by-step explanation:

it would first be which has the largest number after the decimal point, so if there’s three it goes first (0.12*3*). Then you would pick the one that is the smallest form of measurement, which would be meters in this case.


Hope this helped!

3 0
2 years ago
Canela has 96.4 yards of rope to make rope bowls. She
Sladkaya [172]

Answer:

5.2 yds/bowl

Step-by-step explanation:

she used   96.4 - 18.4 = 78 yards  for 15 bowls

78 yards / 15 bowls = 5.2 yds/bowl

7 0
2 years ago
Select all of the statements that are true for the given parabola. A. The minimum is (-1, 6)
ra1l [238]

Answer:

b AND d

Step-by-step explanation:

trust me ON this one

6 0
4 years ago
Other questions:
  • Rectangular swimming pool has a perimeter of (6x-6) feet and a width of x. find the length
    12·1 answer
  • Graph y is less than or equal to 3
    6·2 answers
  • Compute the takt time for a service system that intended to perform a standardized service. The system will have a total work ti
    8·1 answer
  • What is the sequence in 5, 30, 180
    11·1 answer
  • David and Amanda are trying to figure out how long they can live off their $12,350 savings if they spend $240 each month. They h
    14·1 answer
  • In ΔIJK, k = 7.7 cm, i = 3.4 cm and ∠J=30°. Find the length of j, to the nearest 10th of a centimeter.
    6·1 answer
  • What is the slope of the line 3х + 5у — 2х + Зу
    10·1 answer
  • If you get an 85% on a quiz and the quiz is 40 questions how many questions did you get right?
    9·2 answers
  • 63 ⋅ 73 = 423 is this correct
    14·2 answers
  • Please help me I want to go play outside with my sisters
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!