48 + 24 + 12 + 6 = 90 inches or <span>3*(16+8+4+2) = 90 will be the right answer.</span>
It is located in quadrant 3. Hope this helped :D
Answer:
0.5hrs
Step-by-step explanation:
Let the speed downhill be
,
Speed uphill is
. We are told than speed uphill is
the speed on flat ground. Therefore the speed on level ground will be
.
From this info, we can obtain the actual speed,
on level ground as:

speed, distance and time have the relation
so to obtain time to cover 45miles:

Hence it takes 0.5hrs to cover 45miles on flat ground.
We can use the points (2, -2) and (4, -1) to solve.
Slope formula: y2-y1/x2-x1
= -1-2/4-(-2)
= -3/6
= -1/2
Point slope form: y - y1 = m(x - x1)
y - 2 = -1/2(x + 2)
Solve for y-intercept.
-2 = -1/2(2) + b
-2 = -1 + b
-2 + 1 = -1 + 1 + b
-1 = b
Slope Intercept Form: y = mx + b
y = -1/2x - 1
______
Best Regards,
Wolfyy :)