You should use needle-nose pliers, or sometimes even specially designed wrenches to screw on broadheads.
Answer:
Two advantages of the agile methods are:
- The agile method require less documentation process as compared to waterfall model and saves maximum time and money. It basically reduces the efforts and the amount of work.
- In agile method, there is always high customer satisfaction present. In agile method, it is easy to modify in the data as compared to the waterfall model. The customers and developers always interact with each other as the interaction is very important for the good results in the project.
Two disadvantages of the agile methods are:
- For the large and complex projects, sometimes it is difficult to determine the requirements in the software development as projects are easily go off track.
- There is less predictability and the projects are easily messed up if the projects requirement are not clear by the customer end.
MOHR-COULOMB FAILURE CRITERIA:
In 1900, MOHR-COULOMB states Theory of Rupture in Materials which defines as “A material fails due to because of a critical combination of normal and shear stress, not from maximum normal or shear stress”. Failure Envelope is approached by a linear relationship.
If you can not understand the below symbols see the attachment below
f f ()
Where: f = Shear Stress on Failure Plane
´= Normal Stress on Failure Plane
See the graph in the attachment
For calculating the shear stress, when Normal stress, cohesion and angle of internal friction are given. Use this formula: shear stress = f c tan
Where,
• f is Shear Stress on Failure Plane
• c is Cohesion
• is Normal Total Stress on Failure Plane
• is Friction Angle
Here, you go drawn , in paint. Please note that you can simplify further more the circuit by removing any two not following each other.
Answer:
Open and click rates
Explanation:
Open and click rates are measuring units of how well your campaigns perform.